Jinhu Henghai Precision Machinery Co., Ltd

Jinhu Henghai Precision Machinery Co., Ltd

Contact us
 
News information

Daily maintenance of hot melt glue machine

Release time:2019/11/28 0:44:07    Click through rate:697   

Daily maintenance

When installing the hot melt glue machine, a correct and effective ground wire must be connected. Any equipment using high-voltage electricity needs to have a grounding wire. When the grounding wire is not used, any component with insulator protection on the hot melt glue machine may still form a voltage conductor and cause the risk of electric shock. According to the load required by the hot melt glue machine and its auxiliary peripheral equipment, check whether the power line used and the insulation protection meet the requirements. The load of the wire must be higher than the rated power of the hot melt glue machine. Ensure that the voltage from the outside to the hot melt adhesive machine is in line with the hot melt adhesive machine itself, which can not achieve the design performance of the equipment, and may damage the hot melt adhesive machine. When wiring, ensure that its power line is correctly connected to the position of the external breaker. Ensure that the hot melt glue machine operates under the specified voltage. If the voltage used is different from the specified voltage, it may cause the hot melt glue machine to be burnt.

Front:Safety precautions for hot melt glue machine
Next:Daily maintenance of hot melt glue machine
 
Home          About us           Product           Case          News          Download          Honor           Contactus
All rights reserved by Jinhu Henghai Precision Machinery Co., Ltd    Address: Daxing Industrial Zone, Jinhu, Jiangsu
Manager: Mr. Ye Tel:18652339870      Technical support: Mr. Hu Tel:18262709789